A Guide to Ship Repair Estimates in Man-hours. Edition No. 2

  • Book

  • May 2012
  • Elsevier Science and Technology
  • ID: 2088798

Expert ship surveyor Don Butler shares a lifetime's ship repair costing experience in this unique resource for accurate cost estimation and planning

  • Includes hard to come by information on typical ship repair labor expectations for accurate man-hour forecasting and cost estimation

     

  • Produced for marine engineers and marine industry professionals to aid with repair specification and negotiation, helping you to plan work and budgets more reliably
  • Uses man-hours as opposed to particular rates or currencies, providing a long-term model for pricing regardless of location, rate fluctuation, or inflation

Bringing together otherwise scattered details on specific repair and dry-docking activities, this invaluable guide will save you time and improve the accuracy of your ship repair estimates. Don't plan or commission work without it!

Don Butler is a fellow of the Institute of Marine Engineers and a member of the Society of Consulting Marine Engineers and Ship Surveyors, UK.

Please Note: This is an On Demand product, delivery may take up to 11 working days after payment has been received.

Table of Contents

  • Dry-docking works: Berth preparation
  • Shifting of blocks after docking vessel
  • Docking and undocking
  • Dock rent per day
  • Dock services
  • Hull preparation
  • Hull painting
  • Rudder works
  • Propeller
  • Tailshaft. Steel Works: Hull steel repairs. Pipe works: Pipe work renewals in schedule 40 steel
  • Pipe work renewals in schedule 80 steel
  • Pipe work renewals in copper
  • Hot dip galvanising after manufacture. Mechanical works: Overhauling diesel engines
  • Top overhaul
  • Cylinder covers
  • Cylinder liners
  • Bearing survey
  • Crankshaft deflections & crankcase doors
  • Four stroke, Trunk type, Main engines
  • Gear boxes of Medium speed engines
  • Overhauling valves: line valves, pressure valves
  • Main condenser
  • Main steam Turbines
  • Flexible coupling
  • Auxiliary Steam Turbines
  • Turbo Alternator
  • Feed Pumps
  • Oil Tanker Cargo Pump
  • Air Compressors
  • Air Receivers
  • Pumps
  • Boilers. Electrical Works: Insulation resistance tests
  • Electric motors
  • Electric generators
  • Switchboard
  • Running and installing electric cables
  • Installing junction boxes
  • Running and installing cable conduit. General works: Tank cleaning
  • Removal of tank manhole cover for access and refitting with new cover joint
  • pumping out of bilge water or slops into shore facility per tonne
  • Hand cleaning of bilge areas or inside tanks per square metre
  • Hand scraping of internal steel areas per square metre
  • Tank testing by low pressure compressed air
  • Tank testing by filling with sea water.

Author

Don Butler Fellow of Institute of Marine Engineers (F.I.Mar.E.) Member of Society of Consulting Marine Engineers and Ship Surveyors (M.C.M.S.), UK. Don Butler is a fellow of the Institute of Marine Engineers and a member of Society of Consulting Marine Engineers and Ship Surveyors, UK.