The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption.
Please Note: This is an On Demand product, delivery may take up to 11 working days after payment has been received.
Table of Contents
SECTION 1 INNOVATIVE CONSTRUCTION METHODS Chapter 1 Introduction to Modern Accelerated Bridge Construction (ABC) Chapter 2 Recent Developments in ABC Concepts Chapter 3 Research and Training in ABC Structural Systems Chapter 4 Innovative ABC Techniques
SECTION 2 RAPID CONSTRUCTION ISSUES Chapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following Failures Chapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGES Chapter 8 Prefabrication of the Superstructure Chapter 9 Prefabrication of the Substructure And Construction Issues Chapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions