+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Educational Buildings Construction Market in Taiwan - Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

  • PDF Icon

    Report

  • 42 Pages
  • September 2021
  • Region: Taiwan
  • GlobalData
  • ID: 5448811
Growth in Taiwan's educational buildings market continued to increase during the period 2016-2020, reaching a value of TWD50,901.22 million (US$1,720.80 million) in 2020 after increasing at a rate of 10.04% over 2019. The market overall recorded a CAGR of 4.97% from 2016 through to 2020.

Latest Research Report, the Educational Buildings Construction Market in Taiwan - Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Educational Buildings construction market in Taiwan.

The report depicts Educational Buildings as Buildings used for primary, secondary and higher education purposes. This includes, but is not limited to, classrooms, auditoriums, laboratories, libraries, gymnasiums, recreational facilities, dormitories, and facilities for preparing or eating food.

This research handbook provides historic and forecast market data for the Educational Buildings construction market in Taiwan, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2016-2020 and an illustrative forecast to 2025.

It also provides a top-level overview and detailed insight into the operating environment of the Educational Buildings construction market in Taiwan. It is an essential tool for companies active across the Taiwan construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope


  • Overview of the educational buildings construction market in Taiwan.
  • Historic (2016 through 2020) and forecast (2021 through 2025) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the educational buildings market and the data is provided for both historic and forecast periods.

Reasons to Buy


  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • the broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.

Table of Contents

1 Executive Summary
2 Educational Buildings Construction: Market Analytics
2.1 Educational Buildings Construction Output Value, 2016 - 2020
2.2 Educational Buildings Construction Output Value Forecast, 2020 - 2025
2.3 Educational Buildings Construction Output, by Cost Component
2.3.1 Educational Buildings Construction Output, by Cost Component, 2016 - 2020
2.3.2 Educational Buildings Construction Output Forecast, by Cost Component, 2021 - 2025
3 Educational Buildings Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2016 - 2020
3.2 New Construction Output Value Forecast, 2020 - 2025
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2016 - 2020
3.3.2 New Construction Output Forecast, by Cost Component, 2021 - 2025
3.4 Repair and Maintenance Output Value, 2016 - 2020
3.5 Repair and Maintenance Output value Forecast, 2020- 2025
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2016 - 2020
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2021 - 2025
3.7 Refurbishment Construction Output Value, 2016 – 2020
3.8 Refurbishment Construction Output Value Forecast, 2020- 2025
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2016 - 2020
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2021 - 2025
3.1 Demolition Construction Output Value, 2016 - 2020
3.11 Demolition Construction Output Value Forecast, 2020- 2025
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2016 - 2020
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2021 - 2025
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About The Publisher
4.6 Disclaimer
List of Tables
Table 1: Taiwan Educational Buildings Construction Output Value (TWD Million), 2016 - 2020
Table 2: Taiwan Educational Buildings Construction Output Value (US$ Million), 2016 - 2020
Table 3: Taiwan Educational Buildings Construction Output Value (TWD Million), 2020 - 2025
Table 4: Taiwan Educational Buildings Construction Output Value (US$ Million), 2020 - 2025
Table 5: Taiwan Educational Buildings Construction Output, by Cost Component (TWD Million), 2016 – 2020
Table 6: Taiwan Educational Buildings Construction Output, by Cost Component (US$ Million), 2016 – 2020
Table 7: Taiwan Educational Buildings Construction Output, by Cost Component (TWD Million), 2021 - 2025
Table 8: Taiwan Educational Buildings Construction Output, by Cost Component (US$ Million), 2021 - 2025
Table 9: Taiwan Educational Buildings Construction Output Value, New Construction (TWD Million), 2016 - 2020
Table 10: Taiwan Educational Buildings Construction Output Value, New Construction (US$ Million), 2016 - 2020
Table 11: Taiwan Educational Buildings Construction Output Value, New Construction (TWD Million), 2020- 2025
Table 12: Taiwan Educational Buildings Construction Output Value, New Construction (US$ Million), 2020- 2025
Table 13: Taiwan Educational Buildings Construction Output, New Construction by Cost Component (TWD Million), 2016 - 2020
Table 14: Taiwan Educational Buildings Construction Output, New Construction by Cost Component (US$ Million), 2016 - 2020
Table 15: Taiwan Educational Buildings Construction Output, New Construction by Cost Component (TWD Million), 2021 - 2025
Table 16: Taiwan Educational Buildings Construction Output, New Construction by Cost Component (US$ Million), 2021 - 2025
Table 17: Taiwan Educational Buildings Construction Output Value, Repair and Maintenance (TWD Million), 2016 - 2020
Table 18: Taiwan Educational Buildings Construction Output Value, Repair and Maintenance (US$ Million), 2016 - 2020
Table 19: Taiwan Educational Buildings Construction Output Value, Repair and Maintenance (TWD Million), 2020 – 2025
Table 20: Taiwan Educational Buildings Construction Output Value, Repair and Maintenance (US$ Million), 2020 - 2025
Table 21: Taiwan Educational Buildings Construction Output, Repair and Maintenance by Cost Component (TWD Million), 2016 - 2020
Table 22: Taiwan Educational Buildings Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2016 - 2020
Table 23: Taiwan Educational Buildings Construction Output, Repair and Maintenance by Cost Component (TWD Million), 2021 – 2025
Table 24: Taiwan Educational Buildings Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2021 – 2025
Table 25: Taiwan Educational Buildings Construction Output Value, Refurbishment (TWD Million), 2016 - 2020
Table 26: Taiwan Educational Buildings Construction Output Value, Refurbishment (US$ Million), 2016 - 2020
Table 27: Taiwan Educational Buildings Construction Output Value, Refurbishment (TWD Million), 2020 - 2025
Table 28: Taiwan Educational Buildings Construction Output Value, Refurbishment (US$ Million), 2020- 2025
Table 29: Taiwan Educational Buildings Construction Output, Refurbishment by Cost Component (TWD Million), 2016 - 2020
Table 30: Taiwan Educational Buildings Construction Output, Refurbishment by Cost Component (US$ Million), 2016 - 2020
Table 31: Taiwan Educational Buildings Construction Output, Refurbishment by Cost Component (TWD Million), 2021 - 2025
Table 32: Taiwan Educational Buildings Construction Output, Refurbishment by Cost Component (US$ Million), 2021 - 2025
Table 33: Taiwan Educational Buildings Construction Output Value, Demolition (TWD Million), 2016 - 2020
Table 34: Taiwan Educational Buildings Construction Output Value, Demolition (US$ Million), 2016 - 2020
Table 35: Taiwan Educational Buildings Construction Output Value, Demolition (TWD Million), 2020 - 2025
Table 36: Taiwan Educational Buildings Construction Output Value, Demolition (US$ Million), 2020 - 2025
Table 37: Taiwan Educational Buildings Construction Output, Demolition by Cost Component (TWD Million), 2016 - 2020
Table 38: Taiwan Educational Buildings Construction Output, Demolition by Cost Component (US$ Million), 2016 - 2020
Table 39: Taiwan Educational Buildings Construction Output, Demolition by Cost Component (TWD Million), 2021 - 2025
Table 40: Taiwan Educational Buildings Construction Output, Demolition by Cost Component (US$ Million), 2021 - 2025
Table 41: The Publisher – Educational Buildings Market Definitions
Table 42: Exchange Rate, 2016 - 2020
Table 43: Exchange Rate, 2021 - 2025 Forecast
List of Figures
Figure 1: Taiwan Educational Buildings Construction Output Value (TWD Million), 2016 – 2020
Figure 2: Taiwan Educational Buildings Construction Output Value (TWD Million), 2020 – 2025
Figure 3: Taiwan Educational Buildings Construction Output, by Cost Component (TWD Million), 2016 - 2020
Figure 4: Taiwan Educational Buildings Construction Output, by Cost Component (TWD Million), 2021 - 2025
Figure 5: Taiwan Educational Buildings Construction Output Value, New Construction (TWD Million), 2016 - 2020
Figure 6: Taiwan Educational Buildings Construction Output Value, New Construction (TWD Million), 2020 - 2025
Figure 7: Taiwan Educational Buildings Construction Output, New Construction by Cost Component (TWD Million), 2016 - 2020
Figure 8: Taiwan Educational Buildings Construction Output, New Construction by Cost Component (TWD Million), 2021 - 2025
Figure 9: Taiwan Educational Buildings Construction Output Value, Repair and Maintenance (TWD Million), 2016 - 2020
Figure 10: Taiwan Educational Buildings Construction Output Value, Repair and Maintenance (TWD Million), 2020- 2025
Figure 11: Taiwan Educational Buildings Construction Output, Repair and Maintenance by Cost Component (TWD Million), 2016 - 2020
Figure 12: Taiwan Educational Buildings Construction Output, Repair and Maintenance by Cost Component (TWD Million), 2021 – 2025
Figure 13: Taiwan Educational Buildings Construction Output Value, Refurbishment (TWD Million), 2016 - 2020
Figure 14: Taiwan Educational Buildings Construction Output Value, Refurbishment (TWD Million), 2020- 2025
Figure 15: Taiwan Educational Buildings Construction Output, Refurbishment by Cost Component (TWD Million), 2016 - 2020
Figure 16: Taiwan Educational Buildings Construction Output, Refurbishment by Cost Component (TWD Million), 2021 - 2025
Figure 17: Taiwan Educational Buildings Construction Output Value, Demolition (TWD Million), 2016 - 2020
Figure 18: Taiwan Educational Buildings Construction Output Value, Demolition (TWD Million), 2020 - 2025
Figure 19: Taiwan Educational Buildings Construction Output, Demolition by Cost Component (TWD Million), 2016 - 2020
Figure 20: Taiwan Educational Buildings Construction Output, Demolition by Cost Component (TWD Million), 2021 - 2025