+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Water Infrastructure Construction Market in Saudi Arabia - Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

  • PDF Icon

    Report

  • 42 Pages
  • December 2021
  • Region: Saudi Arabia
  • GlobalData
  • ID: 5576083
The water infrastructure construction sector in Saudi Arabia registered a positive Compound Annual Growth Rate (CAGR) of 1.13% during the period 2016 to 2020 with an output value of SAR5,853.22 million in 2020, a decrease of 3.94% over 2019. The sector achieved its strongest performance in 2019 when it grew by 4.45% over the previous year and its weakest performance in 2018, when it decreased by 2.27% over 2017.



Water Infrastructure Construction Market in Saudi Arabia - Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Water Infrastructure construction market in Saudi Arabia.

Drinking and utility water treatment, storage and distribution infrastructure. This includes, but is not limited to, aqueducts, desalination plants, filtration plants, distribution lines, irrigation systems and reservoirs. Dams and hydro-power plants are excluded from this category..

This research handbook provides historic and forecast market data for the Water Infrastructure construction market in Saudi Arabia, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2016-2020 and an illustrative forecast to 2025.

This report also provides a top-level overview and detailed insight into the operating environment of the Water Infrastructure construction market in Saudi Arabia. It is an essential tool for companies active across the Saudi Arabia construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content/sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the water infrastructure construction market in Saudi Arabia
  • Historic (2016 through 2020) and forecast (2021 through 2025) construction market output values are provided
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the water infrastructure market and the data is provided for both historic and forecast periods

Reasons to Buy

  • Enhances your knowledge of the market with key figures detailing construction type
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition)
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services)
  • Allows you to plan future business decisions using the forecast figures given
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market

Table of Contents

1 Executive Summary
2 Water Infrastructure Construction: Market Analytics
2.1 Water Infrastructure Construction Output Value, 2016 - 2020
2.2 Water Infrastructure Construction Output Value Forecast, 2020 - 2025
2.3 Water Infrastructure Construction Output, by Cost Component
2.3.1 Water Infrastructure Construction Output, by Cost Component, 2016 - 2020
2.3.2 Water Infrastructure Construction Output Forecast, by Cost Component, 2021 - 2025
3 Water Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2016 - 2020
3.2 New Construction Output Value Forecast, 2020 - 2025
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2016 - 2020
3.3.2 New Construction Output Forecast, by Cost Component, 2021 - 2025
3.4 Repair and Maintenance Output Value, 2016 - 2020
3.5 Repair and Maintenance Output value Forecast, 2020- 2025
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2016 - 2020
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2021 - 2025
3.7 Refurbishment Construction Output Value, 2016 - 2020
3.8 Refurbishment Construction Output Value Forecast, 2020- 2025
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2016 - 2020
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2021 - 2025
3.1 Demolition Construction Output Value, 2016 - 2020
3.11 Demolition Construction Output Value Forecast, 2020- 2025
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2016 - 2020
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2021 - 2025
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About the Publisher
4.6 Disclaimer
List of Tables
Table 1: Saudi Arabia Water Infrastructure Construction Output Value (SAR Million), 2016 - 2020
Table 2: Saudi Arabia Water Infrastructure Construction Output Value (US$ Million), 2016 - 2020
Table 3: Saudi Arabia Water Infrastructure Construction Output Value (SAR Million), 2020 - 2025
Table 4: Saudi Arabia Water Infrastructure Construction Output Value (US$ Million), 2020 - 2025
Table 5: Saudi Arabia Water Infrastructure Construction Output, by Cost Component (SAR Million), 2016 - 2020
Table 6: Saudi Arabia Water Infrastructure Construction Output, by Cost Component (US$ Million), 2016 - 2020
Table 7: Saudi Arabia Water Infrastructure Construction Output, by Cost Component (SAR Million), 2021 - 2025
Table 8: Saudi Arabia Water Infrastructure Construction Output, by Cost Component (US$ Million), 2021 - 2025
Table 9: Saudi Arabia Water Infrastructure Construction Output Value, New Construction (SAR Million), 2016 - 2020
Table 10: Saudi Arabia Water Infrastructure Construction Output Value, New Construction (US$ Million), 2016 - 2020
Table 11: Saudi Arabia Water Infrastructure Construction Output Value, New Construction (SAR Million), 2020- 2025
Table 12: Saudi Arabia Water Infrastructure Construction Output Value, New Construction (US$ Million), 2020- 2025
Table 13: Saudi Arabia Water Infrastructure Construction Output, New Construction by Cost Component (SAR Million), 2016 - 2020
Table 14: Saudi Arabia Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2016 - 2020
Table 15: Saudi Arabia Water Infrastructure Construction Output, New Construction by Cost Component (SAR Million), 2021 - 2025
Table 16: Saudi Arabia Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2021 - 2025
Table 17: Saudi Arabia Water Infrastructure Construction Output Value, Repair and Maintenance (SAR Million), 2016 - 2020
Table 18: Saudi Arabia Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2016 - 2020
Table 19: Saudi Arabia Water Infrastructure Construction Output Value, Repair and Maintenance (SAR Million), 2020 - 2025
Table 20: Saudi Arabia Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2020 - 2025
Table 21: Saudi Arabia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (SAR Million), 2016 - 2020
Table 22: Saudi Arabia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2016 - 2020
Table 23: Saudi Arabia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (SAR Million), 2021 - 2025
Table 24: Saudi Arabia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2021 - 2025
Table 25: Saudi Arabia Water Infrastructure Construction Output Value, Refurbishment (SAR Million), 2016 - 2020
Table 26: Saudi Arabia Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2016 - 2020
Table 27: Saudi Arabia Water Infrastructure Construction Output Value, Refurbishment (SAR Million), 2020 - 2025
Table 28: Saudi Arabia Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2020- 2025
Table 29: Saudi Arabia Water Infrastructure Construction Output, Refurbishment by Cost Component (SAR Million), 2016 - 2020
Table 30: Saudi Arabia Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2016 - 2020
Table 31: Saudi Arabia Water Infrastructure Construction Output, Refurbishment by Cost Component (SAR Million), 2021 - 2025
Table 32: Saudi Arabia Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2021 - 2025
Table 33: Saudi Arabia Water Infrastructure Construction Output Value, Demolition (SAR Million), 2016 - 2020
Table 34: Saudi Arabia Water Infrastructure Construction Output Value, Demolition (US$ Million), 2016 - 2020
Table 35: Saudi Arabia Water Infrastructure Construction Output Value, Demolition (SAR Million), 2020 - 2025
Table 36: Saudi Arabia Water Infrastructure Construction Output Value, Demolition (US$ Million), 2020 - 2025
Table 37: Saudi Arabia Water Infrastructure Construction Output, Demolition by Cost Component (SAR Million), 2016 - 2020
Table 38: Saudi Arabia Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2016 - 2020
Table 39: Saudi Arabia Water Infrastructure Construction Output, Demolition by Cost Component (SAR Million), 2021 - 2025
Table 40: Saudi Arabia Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2021 - 2025
Table 41: Water Infrastructure Construction Market Definitions
Table 42: Exchange Rate, 2016 - 2020
Table 43: Exchange Rate, 2021 - 2025 Forecast
List of Figures
Figure 1: Saudi Arabia Water Infrastructure Construction Output Value (SAR Million), 2016 - 2020
Figure 2: Saudi Arabia Water Infrastructure Construction Output Value (SAR Million), 2020 - 2025
Figure 3: Saudi Arabia Water Infrastructure Construction Output, by Cost Component (SAR Million), 2016 - 2020
Figure 4: Saudi Arabia Water Infrastructure Construction Output, by Cost Component (SAR Million), 2021 - 2025
Figure 5: Saudi Arabia Water Infrastructure Construction Output Value, New Construction (SAR Million), 2016 - 2020
Figure 6: Saudi Arabia Water Infrastructure Construction Output Value, New Construction (SAR Million), 2020 - 2025
Figure 7: Saudi Arabia Water Infrastructure Construction Output, New Construction by Cost Component (SAR Million), 2016 - 2020
Figure 8: Saudi Arabia Water Infrastructure Construction Output, New Construction by Cost Component (SAR Million), 2021 - 2025
Figure 9: Saudi Arabia Water Infrastructure Construction Output Value, Repair and Maintenance (SAR Million), 2016 - 2020
Figure 10: Saudi Arabia Water Infrastructure Construction Output Value, Repair and Maintenance (SAR Million), 2020- 2025
Figure 11: Saudi Arabia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (SAR Million), 2016 - 2020
Figure 12: Saudi Arabia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (SAR Million), 2021 - 2025
Figure 13: Saudi Arabia Water Infrastructure Construction Output Value, Refurbishment (SAR Million), 2016 - 2020
Figure 14: Saudi Arabia Water Infrastructure Construction Output Value, Refurbishment (SAR Million), 2020- 2025
Figure 15: Saudi Arabia Water Infrastructure Construction Output, Refurbishment by Cost Component (SAR Million), 2016 - 2020
Figure 16: Saudi Arabia Water Infrastructure Construction Output, Refurbishment by Cost Component (SAR Million), 2021 - 2025
Figure 17: Saudi Arabia Water Infrastructure Construction Output Value, Demolition (SAR Million), 2016 - 2020
Figure 18: Saudi Arabia Water Infrastructure Construction Output Value, Demolition (SAR Million), 2020 - 2025
Figure 19: Saudi Arabia Water Infrastructure Construction Output, Demolition by Cost Component (SAR Million), 2016 - 2020
Figure 20: Saudi Arabia Water Infrastructure Construction Output, Demolition by Cost Component (SAR Million), 2021 - 2025

Table Information