+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Belarus Water Infrastructure Construction Market Size and Forecast to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

  • PDF Icon

    Report

  • 41 Pages
  • December 2021
  • Region: Belarus
  • GlobalData
  • ID: 5599953
The water infrastructure construction sector in Belarus registered a positive Compound Annual Growth Rate (CAGR) of 15.76% during the period 2016 to 2020 with an output value of BYR538.19 million in 2020, an increase of17.69% over 2019. The sector achieved its strongest performance in 2018 when it grew by 25.13% over the previous year and its weakest performance in 2016, when it decreased by 20.33% over 2015.



Water Infrastructure Construction Market in Belarus:Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Water Infrastructure construction market in Belarus.

Drinking and utility water treatment, storage and distribution infrastructure. This includes, but is not limited to, aqueducts, desalination plants, filtration plants, distribution lines, irrigation systems and reservoirs. Dams and hydro-power plants are excluded from this category..

This research handbook provides historic and forecast market data for the Water Infrastructure construction market in Belarus, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2016-2020 and an illustrative forecast to 2025.

This report also provides a top-level overview and detailed insight into the operating environment of the Water Infrastructure construction market in Belarus. It is an essential tool for companies active across the Belarus construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content/sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the water infrastructure construction market in Belarus
  • Historic (2016 through 2020) and forecast (2021 through 2025) construction market output values are provided
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the water infrastructure market and the data is provided for both historic and forecast periods

Reasons to Buy

  • Enhances your knowledge of the market with key figures detailing construction type
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition)
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services)
  • Allows you to plan future business decisions using the forecast figures given
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market

Table of Contents

1 Executive Summary

2 Water Infrastructure Construction: Market Analytics
2.1 Water Infrastructure Construction Output Value, 2016 - 2020
2.2 Water Infrastructure Construction Output Value Forecast, 2020 - 2025
2.3 Water Infrastructure Construction Output, by Cost Component
2.3.1 Water Infrastructure Construction Output, by Cost Component, 2016 - 2020
2.3.2 Water Infrastructure Construction Output Forecast, by Cost Component, 2021 - 2025

3 Water Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2016 - 2020
3.2 New Construction Output Value Forecast, 2020 - 2025
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2016 - 2020
3.3.2 New Construction Output Forecast, by Cost Component, 2021 - 2025
3.4 -Repair and Maintenance Output Value, 2016 - 2020
3.5 Repair and Maintenance Output value Forecast, 2020- 2025
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2016 - 2020
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2021 - 2025
3.7 R-efurbishment Construction Output Value, 2016 - 2020
3.8 Refurbishment Construction Output Value Forecast, 2020- 2025
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2016 - 2020
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2021 - 2025
3.1 -Demolition Construction Output Value, 2016 - 2020
3.11 Demolition Construction Output Value Forecast, 2020- 2025
3.12 -Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2016 - 2020
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2021 - 2025

4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About the Publisher
4.6 Disclaimer

List of Tables
  • Table 1: Belarus Water Infrastructure Construction Output Value (BYR Million), 2016 - 2020
  • Table 2: Belarus Water Infrastructure Construction Output Value (US$ Million), 2016 - 2020
  • Table 3: Belarus Water Infrastructure Construction Output Value (BYR Million), 2020 - 2025
  • Table 4: Belarus Water Infrastructure Construction Output Value (US$ Million), 2020 - 2025
  • Table 5: Belarus Water Infrastructure Construction Output, by Cost Component (BYR Million), 2016 - 2020
  • Table 6: Belarus Water Infrastructure Construction Output, by Cost Component (US$ Million), 2016 - 2020
  • Table 7: Belarus Water Infrastructure Construction Output, by Cost Component (BYR Million), 2021 - 2025
  • Table 8: Belarus Water Infrastructure Construction Output, by Cost Component (US$ Million), 2021 - 2025
  • Table 9: Belarus Water Infrastructure Construction Output Value, New Construction (BYR Million), 2016 - 2020
  • Table 10: Belarus Water Infrastructure Construction Output Value, New Construction (US$ Million), 2016 - 2020
  • Table 11: Belarus Water Infrastructure Construction Output Value, New Construction (BYR Million), 2020- 2025
  • Table 12: Belarus Water Infrastructure Construction Output Value, New Construction (US$ Million), 2020- 2025
  • Table 13: Belarus Water Infrastructure Construction Output, New Construction by Cost Component (BYR Million), 2016 - 2020
  • Table 14: Belarus Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2016 - 2020
  • Table 15: Belarus Water Infrastructure Construction Output, New Construction by Cost Component (BYR Million), 2021 - 2025
  • Table 16: Belarus Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2021 - 2025
  • Table 17: Belarus Water Infrastructure Construction Output Value, Repair and Maintenance (BYR Million), 2016 - 2020
  • Table 18: Belarus Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2016 - 2020
  • Table 19: Belarus Water Infrastructure Construction Output Value, Repair and Maintenance (BYR Million), 2020 - 2025
  • Table 20: Belarus Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2020 - 2025
  • Table 21: Belarus Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BYR Million), 2016 - 2020
  • Table 22: Belarus Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2016 - 2020
  • Table 23: Belarus Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BYR Million), 2021 - 2025
  • Table 24: Belarus Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2021 - 2025
  • Table 25: Belarus Water Infrastructure Construction Output Value, Refurbishment (BYR Million), 2016 - 2020
  • Table 26: Belarus Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2016 - 2020
  • Table 27: Belarus Water Infrastructure Construction Output Value, Refurbishment (BYR Million), 2020 - 2025
  • Table 28: Belarus Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2020- 2025
  • Table 29: Belarus Water Infrastructure Construction Output, Refurbishment by Cost Component (BYR Million), 2016 - 2020
  • Table 30: Belarus Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2016 - 2020
  • Table 31: Belarus Water Infrastructure Construction Output, Refurbishment by Cost Component (BYR Million), 2021 - 2025
  • Table 32: Belarus Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2021 - 2025
  • Table 33: Belarus Water Infrastructure Construction Output Value, Demolition (BYR Million), 2016 - 2020
  • Table 34: Belarus Water Infrastructure Construction Output Value, Demolition (US$ Million), 2016 - 2020
  • Table 35: Belarus Water Infrastructure Construction Output Value, Demolition (BYR Million), 2020 - 2025
  • Table 36: Belarus Water Infrastructure Construction Output Value, Demolition (US$ Million), 2020 - 2025
  • Table 37: Belarus Water Infrastructure Construction Output, Demolition by Cost Component (BYR Million), 2016 - 2020
  • Table 38: Belarus Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2016 - 2020
  • Table 39: Belarus Water Infrastructure Construction Output, Demolition by Cost Component (BYR Million), 2021 - 2025
  • Table 40: Belarus Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2021 - 2025
  • Table 41: Water Infrastructure Market Definitions
  • Table 42: Exchange Rate, 2016 - 2020
  • Table 43: Exchange Rate, 2021 - 2025 Forecast

List of Figures
  • Figure 1: Belarus Water Infrastructure Construction Output Value (BYR Million), 2016 - 2020
  • Figure 2: Belarus Water Infrastructure Construction Output Value (BYR Million), 2020 - 2025
  • Figure 3: Belarus Water Infrastructure Construction Output, by Cost Component (BYR Million), 2016 - 2020
  • Figure 4: Belarus Water Infrastructure Construction Output, by Cost Component (BYR Million), 2021 - 2025
  • Figure 5: Belarus Water Infrastructure Construction Output Value, New Construction (BYR Million), 2016 - 2020
  • Figure 6: Belarus Water Infrastructure Construction Output Value, New Construction (BYR Million), 2020 - 2025
  • Figure 7: Belarus Water Infrastructure Construction Output, New Construction by Cost Component (BYR Million), 2016 - 2020
  • Figure 8: Belarus Water Infrastructure Construction Output, New Construction by Cost Component (BYR Million), 2021 - 2025
  • Figure 9: Belarus Water Infrastructure Construction Output Value, Repair and Maintenance (BYR Million), 2016 - 2020
  • Figure 10: Belarus Water Infrastructure Construction Output Value, Repair and Maintenance (BYR Million), 2020- 2025
  • Figure 11: Belarus Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BYR Million), 2016 - 2020
  • Figure 12: Belarus Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BYR Million), 2021 - 2025
  • Figure 13: Belarus Water Infrastructure Construction Output Value, Refurbishment (BYR Million), 2016 - 2020
  • Figure 14: Belarus Water Infrastructure Construction Output Value, Refurbishment (BYR Million), 2020- 2025
  • Figure 15: Belarus Water Infrastructure Construction Output, Refurbishment by Cost Component (BYR Million), 2016 - 2020
  • Figure 16: Belarus Water Infrastructure Construction Output, Refurbishment by Cost Component (BYR Million), 2021 - 2025
  • Figure 17: Belarus Water Infrastructure Construction Output Value, Demolition (BYR Million), 2016 - 2020
  • Figure 18: Belarus Water Infrastructure Construction Output Value, Demolition (BYR Million), 2020 - 2025
  • Figure 19: Belarus Water Infrastructure Construction Output, Demolition by Cost Component (BYR Million), 2016 - 2020
  • Figure 20: Belarus Water Infrastructure Construction Output, Demolition by Cost Component (BYR Million), 2021 - 2025

Table Information