+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Infrastructure Construction Market in Algeria - Market Size and Forecasts to 2026

  • PDF Icon

    Report

  • 55 Pages
  • August 2022
  • Region: Algeria
  • GlobalData
  • ID: 5651168
The infrastructure construction sector of Algeria registered a positive compound annual growth rate (CAGR) of 5.39% during the period 2017 to 2021 with an output value of DZD1,262,070.49 million in 2021, an increase of14.37% over 2020. The sector achieved its strongest performance in 2021 when it grew by 14.37% over the previous year and its weakest performance in 2017, when it decreased by 8.36% over 2016.

Infrastructure Construction Market in Algeria - Market Size and Forecasts to 2026 is a broad level market review of Infrastructure construction market in Algeria.
Heavy infrastructure construction projects including, but not limited to, highways, bridges, tunnels, dams, dikes, subways, and other mass transit projects. For reporting purposes, the market is split into three main categories: rail infrastructure, road infrastructure, and other infrastructure projects. .

This research handbook provides historic and forecast market data for the Infrastructure construction market in Algeria, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Infrastructure construction market in Algeria. It is an essential tool for companies active across the Algeria construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content/sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the infrastructure construction market in Algeria.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types ( construction materials, construction equipment and construction services) across the infrastructure construction market and the data is provided for both historic and forecast periods.

Reasons to Buy

  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.

Table of Contents

1 Executive Summary
2 Infrastructure Construction: Market Analytics
2.1 Infrastructure Construction Output Value, 2017 - 2021
2.2 Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Infrastructure Construction Output, by Cost Component
2.3.1 Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Rail Infrastructure Construction: Market Analytics
4.1 Rail Infrastructure Construction Output Value, 2017 - 2021
4.2 Rail Infrastructure Construction Output Value Forecast, 2021 - 2026
4.3 Rail Infrastructure Construction Output, by Cost Component
4.3.1 Rail Infrastructure Construction Output, by Cost Component, 2017 - 2021
4.3.2 Rail Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
5 Road Infrastructure Construction: Market Analytics
5.1 Road Infrastructure Construction Output Value, 2017 - 2021
5.2 Road Infrastructure Construction Output Value Forecast, 2021 - 2026
5.3 Road Infrastructure Construction Output, by Cost Component
5.3.1 Road Infrastructure Construction Output, by Cost Component, 2017 - 2021
5.3.2 Road Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
6 Appendix
6.1 Definitions
6.2 CAGR Definition and Calculation
6.3 Exchange Rates
6.4 Methodology
6.5 About the Publisher
6.6 Disclaimer
List of Tables
Table 1: Algeria Infrastructure Construction Output Value (DZD Million), 2017 - 2021
Table 2: Algeria Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 3: Algeria Infrastructure Construction Output Value (DZD Million), 2021 - 2026
Table 4: Algeria Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 5: Algeria Infrastructure Construction Output, by Cost Component (DZD Million), 2017 - 2021
Table 6: Algeria Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 7: Algeria Infrastructure Construction Output, by Cost Component (DZD Million), 2022 - 2026
Table 8: Algeria Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Algeria Infrastructure Construction Output Value, New Construction (DZD Million), 2017 - 2021
Table 10: Algeria Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Algeria Infrastructure Construction Output Value, New Construction (DZD Million), 2021- 2026
Table 12: Algeria Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Algeria Infrastructure Construction Output, New Construction by Cost Component (DZD Million), 2017 - 2021
Table 14: Algeria Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Algeria Infrastructure Construction Output, New Construction by Cost Component (DZD Million), 2022 - 2026
Table 16: Algeria Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Algeria Infrastructure Construction Output Value, Repair and Maintenance (DZD Million), 2017 - 2021
Table 18: Algeria Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Algeria Infrastructure Construction Output Value, Repair and Maintenance (DZD Million), 2021 - 2026
Table 20: Algeria Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Algeria Infrastructure Construction Output, Repair and Maintenance by Cost Component (DZD Million), 2017 - 2021
Table 22: Algeria Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Algeria Infrastructure Construction Output, Repair and Maintenance by Cost Component (DZD Million), 2022 - 2026
Table 24: Algeria Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 - 2026
Table 25: Algeria Infrastructure Construction Output Value, Refurbishment (DZD Million), 2017 - 2021
Table 26: Algeria Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Algeria Infrastructure Construction Output Value, Refurbishment (DZD Million), 2021 - 2026
Table 28: Algeria Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Algeria Infrastructure Construction Output, Refurbishment by Cost Component (DZD Million), 2017 - 2021
Table 30: Algeria Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Algeria Infrastructure Construction Output, Refurbishment by Cost Component (DZD Million), 2022 - 2026
Table 32: Algeria Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Algeria Infrastructure Construction Output Value, Demolition (DZD Million), 2017 - 2021
Table 34: Algeria Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Algeria Infrastructure Construction Output Value, Demolition (DZD Million), 2021 - 2026
Table 36: Algeria Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Algeria Infrastructure Construction Output, Demolition by Cost Component (DZD Million), 2017 - 2021
Table 38: Algeria Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Algeria Infrastructure Construction Output, Demolition by Cost Component (DZD Million), 2022 - 2026
Table 40: Algeria Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: Algeria Rail Infrastructure Construction Output Value (DZD Million), 2017 - 2021
Table 42: Algeria Rail Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 43: Algeria Rail Infrastructure Construction Output Value (DZD Million), 2021 - 2026
Table 44: Algeria Rail Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 45: Algeria Rail Infrastructure Construction Output, by Cost Component (DZD Million), 2017 - 2021
Table 46: Algeria Rail Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 47: Algeria Rail Infrastructure Construction Output, by Cost Component (DZD Million), 2022 - 2026
Table 48: Algeria Rail Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 49: Algeria Road Infrastructure Construction Output Value (DZD Million), 2017 - 2021
Table 50: Algeria Road Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 51: Algeria Road Infrastructure Construction Output Value (DZD Million), 2021 - 2026
Table 52: Algeria Road Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 53: Algeria Road Infrastructure Construction Output, by Cost Component (DZD Million), 2017 - 2021
Table 54: Algeria Road Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 55: Algeria Road Infrastructure Construction Output, by Cost Component (DZD Million), 2022 - 2026
Table 56: Algeria Road Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 57: Infrastructure Construction Market Definitions
Table 58: Exchange Rate, 2017 - 2021
Table 59: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Algeria Infrastructure Construction Output Value (DZD Million), 2017 - 2021
Figure 2: Algeria Infrastructure Construction Output Value (DZD Million), 2021 - 2026
Figure 3: Algeria Infrastructure Construction Output, by Cost Component (DZD Million), 2017 - 2021
Figure 4: Algeria Infrastructure Construction Output, by Cost Component (DZD Million), 2022 - 2026
Figure 5: Algeria Infrastructure Construction Output Value, New Construction (DZD Million), 2017 - 2021
Figure 6: Algeria Infrastructure Construction Output Value, New Construction (DZD Million), 2021 - 2026
Figure 7: Algeria Infrastructure Construction Output, New Construction by Cost Component (DZD Million), 2017 - 2021
Figure 8: Algeria Infrastructure Construction Output, New Construction by Cost Component (DZD Million), 2022 - 2026
Figure 9: Algeria Infrastructure Construction Output Value, Repair and Maintenance (DZD Million), 2017 - 2021
Figure 10: Algeria Infrastructure Construction Output Value, Repair and Maintenance (DZD Million), 2021- 2026
Figure 11: Algeria Infrastructure Construction Output, Repair and Maintenance by Cost Component (DZD Million), 2017 - 2021
Figure 12: Algeria Infrastructure Construction Output, Repair and Maintenance by Cost Component (DZD Million), 2022 - 2026
Figure 13: Algeria Infrastructure Construction Output Value, Refurbishment (DZD Million), 2017 - 2021
Figure 14: Algeria Infrastructure Construction Output Value, Refurbishment (DZD Million), 2021- 2026
Figure 15: Algeria Infrastructure Construction Output, Refurbishment by Cost Component (DZD Million), 2017 - 2021
Figure 16: Algeria Infrastructure Construction Output, Refurbishment by Cost Component (DZD Million), 2022 - 2026
Figure 17: Algeria Infrastructure Construction Output Value, Demolition (DZD Million), 2017 - 2021
Figure 18: Algeria Infrastructure Construction Output Value, Demolition (DZD Million), 2021 - 2026
Figure 19: Algeria Infrastructure Construction Output, Demolition by Cost Component (DZD Million), 2017 - 2021
Figure 20: Algeria Infrastructure Construction Output, Demolition by Cost Component (DZD Million), 2022 - 2026
Figure 21: Algeria Rail Infrastructure Construction Output Value (DZD Million), 2017 - 2021
Figure 22: Algeria Rail Infrastructure Construction Output Value (DZD Million), 2021 - 2026
Figure 23: Algeria Rail Infrastructure Construction Output, by Cost Component (DZD Million), 2017 - 2021
Figure 24: Algeria Rail Infrastructure Construction Output, by Cost Component (DZD Million), 2022 - 2026
Figure 25: Algeria Road Infrastructure Construction Output Value (DZD Million), 2017 - 2021
Figure 26: Algeria Road Infrastructure Construction Output Value (DZD Million), 2021 - 2026
Figure 27: Algeria Road Infrastructure Construction Output, by Cost Component (DZD Million), 2017 - 2021
Figure 28: Algeria Road Infrastructure Construction Output, by Cost Component (DZD Million), 2022 - 2026

Table Information