+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Water Infrastructure Construction Market in Bulgaria - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

  • PDF Icon

    Report

  • 41 Pages
  • March 2023
  • Region: Bulgaria
  • GlobalData
  • ID: 5765692
The water infrastructure construction sector in Bulgaria registered a positive Compound Annual Growth Rate (CAGR) of 18.67% during the period 2017 to 2021 with an output value of BGN476.43 million in 2021, a decrease of 8.71% over 2020. The sector achieved its strongest performance in 2020 when it grew by 31.60% over the previous year and its weakest performance in 2017, when it decreased by 34.00% over 2016.

Water Infrastructure Construction Market in Bulgaria - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Water Infrastructure construction market in Bulgaria.

Drinking and utility water treatment, storage and distribution infrastructure. This includes, but is not limited to, aqueducts, desalination plants, filtration plants, distribution lines, irrigation systems and reservoirs. Dams and hydro-power plants are excluded from this category..

This research handbook provides historic and forecast market data for the Water Infrastructure construction market in Bulgaria, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Water Infrastructure construction market in Bulgaria. It is an essential tool for companies active across the Bulgaria construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content/sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the water infrastructure construction market in Bulgaria.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the water infrastructure market and the data is provided for both historic and forecast periods.

Reasons to Buy

  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.

Table of Contents

1 Executive Summary
2 Water Infrastructure Construction: Market Analytics
2.1 Water Infrastructure Construction Output Value, 2017 - 2021
2.2 Water Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Water Infrastructure Construction Output, by Cost Component
2.3.1 Water Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Water Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Water Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About the Publisher
4.6 Disclaimer
List of Tables
Table 1: Bulgaria Water Infrastructure Construction Output Value (BGN Million), 2017 - 2021
Table 2: Bulgaria Water Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 3: Bulgaria Water Infrastructure Construction Output Value (BGN Million), 2021 - 2026
Table 4: Bulgaria Water Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 5: Bulgaria Water Infrastructure Construction Output, by Cost Component (BGN Million), 2017 - 2021
Table 6: Bulgaria Water Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 7: Bulgaria Water Infrastructure Construction Output, by Cost Component (BGN Million), 2022 - 2026
Table 8: Bulgaria Water Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Bulgaria Water Infrastructure Construction Output Value, New Construction (BGN Million), 2017 - 2021
Table 10: Bulgaria Water Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Bulgaria Water Infrastructure Construction Output Value, New Construction (BGN Million), 2021- 2026
Table 12: Bulgaria Water Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Bulgaria Water Infrastructure Construction Output, New Construction by Cost Component (BGN Million), 2017 - 2021
Table 14: Bulgaria Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Bulgaria Water Infrastructure Construction Output, New Construction by Cost Component (BGN Million), 2022 - 2026
Table 16: Bulgaria Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Bulgaria Water Infrastructure Construction Output Value, Repair and Maintenance (BGN Million), 2017 - 2021
Table 18: Bulgaria Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Bulgaria Water Infrastructure Construction Output Value, Repair and Maintenance (BGN Million), 2021 - 2026
Table 20: Bulgaria Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Bulgaria Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BGN Million), 2017 - 2021
Table 22: Bulgaria Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Bulgaria Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BGN Million), 2022 - 2026
Table 24: Bulgaria Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 - 2026
Table 25: Bulgaria Water Infrastructure Construction Output Value, Refurbishment (BGN Million), 2017 - 2021
Table 26: Bulgaria Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Bulgaria Water Infrastructure Construction Output Value, Refurbishment (BGN Million), 2021 - 2026
Table 28: Bulgaria Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Bulgaria Water Infrastructure Construction Output, Refurbishment by Cost Component (BGN Million), 2017 - 2021
Table 30: Bulgaria Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Bulgaria Water Infrastructure Construction Output, Refurbishment by Cost Component (BGN Million), 2022 - 2026
Table 32: Bulgaria Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Bulgaria Water Infrastructure Construction Output Value, Demolition (BGN Million), 2017 - 2021
Table 34: Bulgaria Water Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Bulgaria Water Infrastructure Construction Output Value, Demolition (BGN Million), 2021 - 2026
Table 36: Bulgaria Water Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Bulgaria Water Infrastructure Construction Output, Demolition by Cost Component (BGN Million), 2017 - 2021
Table 38: Bulgaria Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Bulgaria Water Infrastructure Construction Output, Demolition by Cost Component (BGN Million), 2022 - 2026
Table 40: Bulgaria Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: Water Infrastructure Construction Market Definitions
Table 42: Exchange Rate, 2017 - 2021
Table 43: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Bulgaria Water Infrastructure Construction Output Value (BGN Million), 2017 - 2021
Figure 2: Bulgaria Water Infrastructure Construction Output Value (BGN Million), 2021 - 2026
Figure 3: Bulgaria Water Infrastructure Construction Output, by Cost Component (BGN Million), 2017 - 2021
Figure 4: Bulgaria Water Infrastructure Construction Output, by Cost Component (BGN Million), 2022 - 2026
Figure 5: Bulgaria Water Infrastructure Construction Output Value, New Construction (BGN Million), 2017 - 2021
Figure 6: Bulgaria Water Infrastructure Construction Output Value, New Construction (BGN Million), 2021 - 2026
Figure 7: Bulgaria Water Infrastructure Construction Output, New Construction by Cost Component (BGN Million), 2017 - 2021
Figure 8: Bulgaria Water Infrastructure Construction Output, New Construction by Cost Component (BGN Million), 2022 - 2026
Figure 9: Bulgaria Water Infrastructure Construction Output Value, Repair and Maintenance (BGN Million), 2017 - 2021
Figure 10: Bulgaria Water Infrastructure Construction Output Value, Repair and Maintenance (BGN Million), 2021- 2026
Figure 11: Bulgaria Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BGN Million), 2017 - 2021
Figure 12: Bulgaria Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (BGN Million), 2022 - 2026
Figure 13: Bulgaria Water Infrastructure Construction Output Value, Refurbishment (BGN Million), 2017 - 2021
Figure 14: Bulgaria Water Infrastructure Construction Output Value, Refurbishment (BGN Million), 2021- 2026
Figure 15: Bulgaria Water Infrastructure Construction Output, Refurbishment by Cost Component (BGN Million), 2017 - 2021
Figure 16: Bulgaria Water Infrastructure Construction Output, Refurbishment by Cost Component (BGN Million), 2022 - 2026
Figure 17: Bulgaria Water Infrastructure Construction Output Value, Demolition (BGN Million), 2017 - 2021
Figure 18: Bulgaria Water Infrastructure Construction Output Value, Demolition (BGN Million), 2021 - 2026
Figure 19: Bulgaria Water Infrastructure Construction Output, Demolition by Cost Component (BGN Million), 2017 - 2021
Figure 20: Bulgaria Water Infrastructure Construction Output, Demolition by Cost Component (BGN Million), 2022 - 2026

Table Information