+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Electricity and Power Construction Market in India - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

  • PDF Icon

    Report

  • 41 Pages
  • April 2023
  • Region: India
  • GlobalData
  • ID: 5804867
The electricity and power construction sector in India registered a positive Compound Annual Growth Rate (CAGR) of 11.44% during the period 2017 to 2021 with an output value of INR7,281,436.28 million in 2021, an increase of39.05% over 2020. The sector achieved its strongest performance in 2021 when it grew by 39.05% over the previous year and its weakest performance in 2020, when it decreased by 8.38% over 2019.

Electricity and Power Construction Market in India - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Electricity and Power construction market in India.

Buildings for power generation and transmission, and electrical transmission infrastructure including the laying and installation of cables, pipes and transmitting towers. .

This research handbook provides historic and forecast market data for the Electricity and Power construction market in India, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Electricity and Power construction market in India. It is an essential tool for companies active across the India construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content/sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the electricity and power construction market in India
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the electricity and power market and the data is provided for both historic and forecast periods

Reasons to Buy

  • Enhances your knowledge of the market with key figures detailing construction type
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition)
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services)
  • Allows you to plan future business decisions using the forecast figures given
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.

Table of Contents

1 Executive Summary
2 Electricity and Power Construction: Market Analytics
2.1 Electricity and Power Construction Output Value, 2017 - 2021
2.2 Electricity and Power Construction Output Value Forecast, 2021 - 2026
2.3 Electricity and Power Construction Output, by Cost Component
2.3.1 Electricity and Power Construction Output, by Cost Component, 2017 - 2021
2.3.2 Electricity and Power Construction Output Forecast, by Cost Component, 2022 - 2026
3 Electricity and Power Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About the Publisher
4.6 Disclaimer
List of Tables
Table 1: India Electricity and Power Construction Output Value (INR Million), 2017 - 2021
Table 2: India Electricity and Power Construction Output Value (US$ Million), 2017 - 2021
Table 3: India Electricity and Power Construction Output Value (INR Million), 2021 - 2026
Table 4: India Electricity and Power Construction Output Value (US$ Million), 2021 - 2026
Table 5: India Electricity and Power Construction Output, by Cost Component (INR Million), 2017 - 2021
Table 6: India Electricity and Power Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 7: India Electricity and Power Construction Output, by Cost Component (INR Million), 2022 - 2026
Table 8: India Electricity and Power Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: India Electricity and Power Construction Output Value, New Construction (INR Million), 2017 - 2021
Table 10: India Electricity and Power Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: India Electricity and Power Construction Output Value, New Construction (INR Million), 2021- 2026
Table 12: India Electricity and Power Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: India Electricity and Power Construction Output, New Construction by Cost Component (INR Million), 2017 - 2021
Table 14: India Electricity and Power Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: India Electricity and Power Construction Output, New Construction by Cost Component (INR Million), 2022 - 2026
Table 16: India Electricity and Power Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: India Electricity and Power Construction Output Value, Repair and Maintenance (INR Million), 2017 - 2021
Table 18: India Electricity and Power Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: India Electricity and Power Construction Output Value, Repair and Maintenance (INR Million), 2021 - 2026
Table 20: India Electricity and Power Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: India Electricity and Power Construction Output, Repair and Maintenance by Cost Component (INR Million), 2017 - 2021
Table 22: India Electricity and Power Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: India Electricity and Power Construction Output, Repair and Maintenance by Cost Component (INR Million), 2022 - 2026
Table 24: India Electricity and Power Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 - 2026
Table 25: India Electricity and Power Construction Output Value, Refurbishment (INR Million), 2017 - 2021
Table 26: India Electricity and Power Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: India Electricity and Power Construction Output Value, Refurbishment (INR Million), 2021 - 2026
Table 28: India Electricity and Power Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: India Electricity and Power Construction Output, Refurbishment by Cost Component (INR Million), 2017 - 2021
Table 30: India Electricity and Power Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: India Electricity and Power Construction Output, Refurbishment by Cost Component (INR Million), 2022 - 2026
Table 32: India Electricity and Power Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: India Electricity and Power Construction Output Value, Demolition (INR Million), 2017 - 2021
Table 34: India Electricity and Power Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: India Electricity and Power Construction Output Value, Demolition (INR Million), 2021 - 2026
Table 36: India Electricity and Power Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: India Electricity and Power Construction Output, Demolition by Cost Component (INR Million), 2017 - 2021
Table 38: India Electricity and Power Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: India Electricity and Power Construction Output, Demolition by Cost Component (INR Million), 2022 - 2026
Table 40: India Electricity and Power Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: GlobalData - Electricity and Power Construction Market Definitions
Table 42: Exchange Rate, 2017 - 2021
Table 43: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: India Electricity and Power Construction Output Value (INR Million), 2017 - 2021
Figure 2: India Electricity and Power Construction Output Value (INR Million), 2021 - 2026
Figure 3: India Electricity and Power Construction Output, by Cost Component (INR Million), 2017 - 2021
Figure 4: India Electricity and Power Construction Output, by Cost Component (INR Million), 2022 - 2026
Figure 5: India Electricity and Power Construction Output Value, New Construction (INR Million), 2017 - 2021
Figure 6: India Electricity and Power Construction Output Value, New Construction (INR Million), 2021 - 2026
Figure 7: India Electricity and Power Construction Output, New Construction by Cost Component (INR Million), 2017 - 2021
Figure 8: India Electricity and Power Construction Output, New Construction by Cost Component (INR Million), 2022 - 2026
Figure 9: India Electricity and Power Construction Output Value, Repair and Maintenance (INR Million), 2017 - 2021
Figure 10: India Electricity and Power Construction Output Value, Repair and Maintenance (INR Million), 2021- 2026
Figure 11: India Electricity and Power Construction Output, Repair and Maintenance by Cost Component (INR Million), 2017 - 2021
Figure 12: India Electricity and Power Construction Output, Repair and Maintenance by Cost Component (INR Million), 2022 - 2026
Figure 13: India Electricity and Power Construction Output Value, Refurbishment (INR Million), 2017 - 2021
Figure 14: India Electricity and Power Construction Output Value, Refurbishment (INR Million), 2021- 2026
Figure 15: India Electricity and Power Construction Output, Refurbishment by Cost Component (INR Million), 2017 - 2021
Figure 16: India Electricity and Power Construction Output, Refurbishment by Cost Component (INR Million), 2022 - 2026
Figure 17: India Electricity and Power Construction Output Value, Demolition (INR Million), 2017 - 2021
Figure 18: India Electricity and Power Construction Output Value, Demolition (INR Million), 2021 - 2026
Figure 19: India Electricity and Power Construction Output, Demolition by Cost Component (INR Million), 2017 - 2021
Figure 20: India Electricity and Power Construction Output, Demolition by Cost Component (INR Million), 2022 - 2026

Table Information