+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Water Infrastructure Construction Market in Malaysia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

  • PDF Icon

    Report

  • 41 Pages
  • May 2023
  • Region: Malaysia
  • GlobalData
  • ID: 5823095
The water infrastructure construction sector in Malaysia registered a Compound Annual Rate of Change (CARC) of -3.24% during the period 2017 to 2021 with an output value of MYR2,692.61 million in 2021, an increase of9.04% over 2020. The sector achieved its strongest performance in 2018 when it grew by 20.01% over the previous year and its weakest performance in 2020, when it decreased by 22.86% over 2019.

Water Infrastructure Construction Market in Malaysia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Water Infrastructure construction market in Malaysia.

Drinking and utility water treatment, storage and distribution infrastructure. This includes, but is not limited to, aqueducts, desalination plants, filtration plants, distribution lines, irrigation systems and reservoirs. Dams and hydro-power plants are excluded from this category.

This research handbook provides historic and forecast market data for the Water Infrastructure construction market in Malaysia, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Water Infrastructure construction market in Malaysia. It is an essential tool for companies active across the Malaysia construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content/sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the water infrastructure construction market in Malaysia
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the water infrastructure market and the data is provided for both historic and forecast periods

Reasons to Buy

  • Enhances your knowledge of the market with key figures detailing construction type
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition)
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services)
  • Allows you to plan future business decisions using the forecast figures given
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.

Table of Contents

1 Executive Summary
2 Water Infrastructure Construction: Market Analytics
2.1 Water Infrastructure Construction Output Value, 2017 - 2021
2.2 Water Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Water Infrastructure Construction Output, by Cost Component
2.3.1 Water Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Water Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Water Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About the Publisher
4.6 Disclaimer
List of Tables
Table 1: Malaysia Water Infrastructure Construction Output Value (MYR Million), 2017 - 2021
Table 2: Malaysia Water Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 3: Malaysia Water Infrastructure Construction Output Value (MYR Million), 2021 - 2026
Table 4: Malaysia Water Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 5: Malaysia Water Infrastructure Construction Output, by Cost Component (MYR Million), 2017 - 2021
Table 6: Malaysia Water Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 7: Malaysia Water Infrastructure Construction Output, by Cost Component (MYR Million), 2022 - 2026
Table 8: Malaysia Water Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Malaysia Water Infrastructure Construction Output Value, New Construction (MYR Million), 2017 - 2021
Table 10: Malaysia Water Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Malaysia Water Infrastructure Construction Output Value, New Construction (MYR Million), 2021- 2026
Table 12: Malaysia Water Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Malaysia Water Infrastructure Construction Output, New Construction by Cost Component (MYR Million), 2017 - 2021
Table 14: Malaysia Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Malaysia Water Infrastructure Construction Output, New Construction by Cost Component (MYR Million), 2022 - 2026
Table 16: Malaysia Water Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Malaysia Water Infrastructure Construction Output Value, Repair and Maintenance (MYR Million), 2017 - 2021
Table 18: Malaysia Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Malaysia Water Infrastructure Construction Output Value, Repair and Maintenance (MYR Million), 2021 - 2026
Table 20: Malaysia Water Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Malaysia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2017 - 2021
Table 22: Malaysia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Malaysia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2022 - 2026
Table 24: Malaysia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 - 2026
Table 25: Malaysia Water Infrastructure Construction Output Value, Refurbishment (MYR Million), 2017 - 2021
Table 26: Malaysia Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Malaysia Water Infrastructure Construction Output Value, Refurbishment (MYR Million), 2021 - 2026
Table 28: Malaysia Water Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Malaysia Water Infrastructure Construction Output, Refurbishment by Cost Component (MYR Million), 2017 - 2021
Table 30: Malaysia Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Malaysia Water Infrastructure Construction Output, Refurbishment by Cost Component (MYR Million), 2022 - 2026
Table 32: Malaysia Water Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Malaysia Water Infrastructure Construction Output Value, Demolition (MYR Million), 2017 - 2021
Table 34: Malaysia Water Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Malaysia Water Infrastructure Construction Output Value, Demolition (MYR Million), 2021 - 2026
Table 36: Malaysia Water Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Malaysia Water Infrastructure Construction Output, Demolition by Cost Component (MYR Million), 2017 - 2021
Table 38: Malaysia Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Malaysia Water Infrastructure Construction Output, Demolition by Cost Component (MYR Million), 2022 - 2026
Table 40: Malaysia Water Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: Water Infrastructure Construction Market Definitions
Table 42: Exchange Rate, 2017 - 2021
Table 43: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Malaysia Water Infrastructure Construction Output Value (MYR Million), 2017 - 2021
Figure 2: Malaysia Water Infrastructure Construction Output Value (MYR Million), 2021 - 2026
Figure 3: Malaysia Water Infrastructure Construction Output, by Cost Component (MYR Million), 2017 - 2021
Figure 4: Malaysia Water Infrastructure Construction Output, by Cost Component (MYR Million), 2022 - 2026
Figure 5: Malaysia Water Infrastructure Construction Output Value, New Construction (MYR Million), 2017 - 2021
Figure 6: Malaysia Water Infrastructure Construction Output Value, New Construction (MYR Million), 2021 - 2026
Figure 7: Malaysia Water Infrastructure Construction Output, New Construction by Cost Component (MYR Million), 2017 - 2021
Figure 8: Malaysia Water Infrastructure Construction Output, New Construction by Cost Component (MYR Million), 2022 - 2026
Figure 9: Malaysia Water Infrastructure Construction Output Value, Repair and Maintenance (MYR Million), 2017 - 2021
Figure 10: Malaysia Water Infrastructure Construction Output Value, Repair and Maintenance (MYR Million), 2021- 2026
Figure 11: Malaysia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2017 - 2021
Figure 12: Malaysia Water Infrastructure Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2022 - 2026
Figure 13: Malaysia Water Infrastructure Construction Output Value, Refurbishment (MYR Million), 2017 - 2021
Figure 14: Malaysia Water Infrastructure Construction Output Value, Refurbishment (MYR Million), 2021- 2026
Figure 15: Malaysia Water Infrastructure Construction Output, Refurbishment by Cost Component (MYR Million), 2017 - 2021
Figure 16: Malaysia Water Infrastructure Construction Output, Refurbishment by Cost Component (MYR Million), 2022 - 2026
Figure 17: Malaysia Water Infrastructure Construction Output Value, Demolition (MYR Million), 2017 - 2021
Figure 18: Malaysia Water Infrastructure Construction Output Value, Demolition (MYR Million), 2021 - 2026
Figure 19: Malaysia Water Infrastructure Construction Output, Demolition by Cost Component (MYR Million), 2017 - 2021
Figure 20: Malaysia Water Infrastructure Construction Output, Demolition by Cost Component (MYR Million), 2022 - 2026

Table Information