Data Center Construction Global Market Report 2024

  • PDF Icon

    Report

  • 175 Pages
  • January 2024
  • Region: Global
  • The Business Research Company
  • ID: 5930978
The global data center construction market has grown strongly in recent years. It will grow from $250.4 billion in 2023 to $270.07 billion in 2024 at a compound annual growth rate (CAGR) of 7.9%. The growth in the historic period can be attributed to growing demand for data storage and processing, rising investments in digital infrastructure, globalization, demand for colocation data centers.

The global data center construction market is expected to see strong growth in the next few years. It will grow to $364.67 billion in 2028 at a compound annual growth rate (CAGR) of 7.8%. The growth in the forecast period can be attributed to growth of the digital economy, expanding global data center, shift to cloud computing, growing demand for edge data centers, 5g rollout. Major trends in the forecast period include sustainability and green design, modular data centers, security and compliance, data center-as-a-service.

The increase in data usage within cloud computing is anticipated to be a significant driver for the expansion of the data center construction market in the foreseeable future. Data usage, in this context, refers to the amount of data transferred to and from devices. The growing demand for data storage and processing calls for the construction of additional data center facilities. For instance, a legal technology survey conducted by the American Bar Association in November 2022 reported a substantial increase in overall cloud data usage, rising from 60% in 2021 to 70% in 2022. Furthermore, solo cloud users increased from 52% to 84% within a year. This data underscores how the growing demand for data is a primary factor fueling the growth of the data center construction market.

The high demand for cloud services is anticipated to be a key driver for the continued growth of the data center construction market. Cloud services encompass a wide array of on-demand computing resources and applications that are delivered via the internet. With the proliferation of digital data and the increasing utilization of cloud computing, big data analytics, and Internet of Things (IoT) applications, the need for data storage has risen significantly. This growing demand for cloud services is a driving force behind the construction of data centers. Providers are expanding their infrastructure to meet the evolving needs of users while ensuring top-notch performance, reliability, and security. For example, data from September 2022, as reported by the AAG IT Support Service, indicated that a global study involving 753 technical and business professionals revealed a substantial increase in cloud service usage, with 63% of respondents reporting heavy reliance on these services. This marked an increase from 59% in 2021 and 53% in 2020. Consequently, the data center construction market is expected to continue thriving due to the strong demand for cloud services.

The persistence of supply chain disruptions remains a significant impediment to the growth of the data center construction market during the forecast period. The construction of data centers relies on a multifaceted supply chain encompassing various components and materials. Any disruptions within this supply chain can result in delays and increased project costs. For example, data from March 2023, as reported by AFCOM, a professional association for IT and data center specialists, indicated that 44% of surveyed data center operators experienced outages due to their inability to procure necessary parts. Additionally, 94% of these operators had encountered at least one outage in the past two years. Consequently, the data center construction market continues to face challenges posed by disruptions in the supply chain.

Major players operating in the data center construction market are concentrating on the technological advancement of products by implementing innovations such as Universal Data Hall Design (UDHD) to improve their market share. Universal Data Hall Design (UDHD) ) is a data center design that includes typical colocation components while emphasizing flexibility and scalability. UDHD has a slab floor with perimeter cooling, making it suited for large full-hall high-performance computing (HPC) applications deployments. For instance, in August 2023, DataBank Holdings Ltd., a US-based provider of information management services, launched Universal Data Hall Design (UDHD), a new innovative approach for high-density data center construction to support high-performance computing (HPC). Universal Data Hall Design (UDHD) allows HPC by giving enterprises the flexibility to handle whatever deployment their workloads need.

In December 2021, Equinix Inc., a U.S.-based company specializing in data center construction and solutions, completed its acquisition of MainOne for $320 million. This strategic move allows Platform Equinix to establish a stronger foothold in West Africa, providing access to one of the world's rapidly growing markets for enterprises, both within and outside of Africa. MainOne, based in Nigeria, is a prominent provider of data center construction and connectivity solutions.

Major players in the data center construction market are Google LLC, Amazon Web Services Inc., Microsoft Azure, The International Business Machines Corporation, Schneider Electric SE, Meta Platforms Inc., NTT Ltd., Turner Construction Co, STO Building Group Inc., Equinix Inc., DPR Construction Inc., Iron Mountain Inc., Digital Realty Trust Inc., Stantec Inc., SAS Institute Inc., Zayo Group Holdings Inc., Gensler, CyrusOne LLC, Hensel Phelps Construction Co., Cyxtera Technologies LLC, Fortis Construction Inc., QTS Realty Trust Inc., HITT Contracting Inc., TierPoint LLC, Sabey Data Center Properties LLC, Flexential Corp., Holder Construction Group LLC, Cologix Inc., Alfa Tech Consulting Engineers Inc., ipSpace.net AG.

North America was the largest region in the data center construction market in 2023. The regions covered in data center construction report are Asia-Pacific, Western Europe, Eastern Europe, North America, South America, Middle East and Africa. The countries covered in the data center construction market report are Australia, Brazil, China, France, Germany, India, Indonesia, Japan, Russia, South Korea, UK, USA, Canada, Italy, Spain.

The primary categories of data center construction include small-scale data centers, medium-scale data centers, and large-scale data centers. Small data centers refer to server storage spaces, rooms, and regional information centers with a computing floor area of less than 5,000 square feet. These data centers feature key infrastructure components such as electrical infrastructure, networking infrastructure, and others, complete with power distribution and cooling systems. They find application in various sectors, including banking, financial services, insurance (BFSI), energy, government, healthcare, manufacturing, IT and telecom, and more.

This report provides data center construction market statistics, including data center construction industry global market size, regional shares, competitors with a data center construction market share, detailed data center construction market segments, market trends and opportunities and any further data you may need to thrive in the data center construction industry. This data center construction market research report delivers a complete perspective of everything you need, with an in-depth analysis of the current and future scenario of the industry.

The data center construction market includes revenues earned by entities by planning, developing and providing construction assistance for extremely profitable and effective next-generation data center. The market value includes the value of related goods sold by the service provider or included within the service offering. The data center construction market also includes sales of generators, power infrastructure, cooling infrastructure and physical security. Values in this market are ‘factory gate’ values, that is the value of goods sold by the manufacturers or creators of the goods, whether to other entities (including downstream manufacturers, wholesalers, distributors and retailers) or directly to end customers. The value of goods in this market includes related services sold by the creators of the goods.

The market value is defined as the revenues that enterprises gain from the sale of goods and/or services within the specified market and geography through sales, grants, or donations in terms of the currency (in USD unless otherwise specified).

The revenues for a specified geography are consumption values that are revenues generated by organizations in the specified geography within the market, irrespective of where they are produced. It does not include revenues from resales along the supply chain, either further along the supply chain or as part of other products.

This product will be delivered within 3-5 business days.

Table of Contents

1. Executive Summary2. Data Center Construction Market Characteristics3. Data Center Construction Market Trends and Strategies
4. Data Center Construction Market - Macro Economic Scenario
4.1. Impact of High Inflation on the Market
4.2. Ukraine-Russia War Impact on the Market
4.3. COVID-19 Impact on the Market
5. Global Data Center Construction Market Size and Growth
5.1. Global Data Center Construction Market Drivers and Restraints
5.1.1. Drivers of the Market
5.1.2. Restraints of the Market
5.2. Global Data Center Construction Historic Market Size and Growth, 2018-2023, Value ($ Billion)
5.3. Global Data Center Construction Forecast Market Size and Growth, 2023-2028, 2033F, Value ($ Billion)
6. Data Center Construction Market Segmentation
6.1. Global Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
  • Small-Scale Data Centers
  • Medium-Scale Data Centers
  • Large-Scale Data Centers
6.2. Global Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
  • Electrical Infrastructure
  • Networking Infrastructure
  • Other Infrastructures
6.3. Global Data Center Construction Market, Segmentation by Power Distribution and Cooling Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
  • Power Distribution
  • Cooling
6.4. Global Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
  • Banking, Financial Services, and Insurance (BFSI)
  • Energy
  • Government
  • Healthcare
  • Manufacturing
  • IT and Telecom
  • Others End-Uses
7. Data Center Construction Market Regional and Country Analysis
7.1. Global Data Center Construction Market, Split by Region, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
7.2. Global Data Center Construction Market, Split by Country, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
8. Asia-Pacific Data Center Construction Market
8.1. Asia-Pacific Data Center Construction Market Overview
Region Information, Impact of COVID-19, Market Information, Background Information, Government Initiatives, Regulations, Regulatory Bodies, Major Associations, Taxes Levied, Corporate Tax Structure, Investments, Major Companies
8.2. Asia-Pacific Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
8.3. Asia-Pacific Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
8.4. Asia-Pacific Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
9. China Data Center Construction Market
9.1. China Data Center Construction Market Overview
9.2. China Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F,$ Billion
9.3. China Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F,$ Billion
9.4. China Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F,$ Billion
10. India Data Center Construction Market
10.1. India Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
10.2. India Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
10.3. India Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
11. Japan Data Center Construction Market
11.1. Japan Data Center Construction Market Overview
11.2. Japan Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
11.3. Japan Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
11.4. Japan Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
12. Australia Data Center Construction Market
12.1. Australia Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
12.2. Australia Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
12.3. Australia Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
13. Indonesia Data Center Construction Market
13.1. Indonesia Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
13.2. Indonesia Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
13.3. Indonesia Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
14. South Korea Data Center Construction Market
14.1. South Korea Data Center Construction Market Overview
14.2. South Korea Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
14.3. South Korea Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
14.4. South Korea Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
15. Western Europe Data Center Construction Market
15.1. Western Europe Data Center Construction Market Overview
15.2. Western Europe Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
15.3. Western Europe Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
15.4. Western Europe Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
16. UK Data Center Construction Market
16.1. UK Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
16.2. UK Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
16.3. UK Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
17. Germany Data Center Construction Market
17.1. Germany Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
17.2. Germany Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
17.3. Germany Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
18. France Data Center Construction Market
18.1. France Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
18.2. France Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
18.3. France Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
19. Italy Data Center Construction Market
19.1. Italy Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
19.2. Italy Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
19.3. Italy Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
20. Spain Data Center Construction Market
20.1. Spain Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
20.2. Spain Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
20.3. Spain Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
21. Eastern Europe Data Center Construction Market
21.1. Eastern Europe Data Center Construction Market Overview
21.2. Eastern Europe Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
21.3. Eastern Europe Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
21.4. Eastern Europe Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
22. Russia Data Center Construction Market
22.1. Russia Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
22.2. Russia Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
22.3. Russia Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
23. North America Data Center Construction Market
23.1. North America Data Center Construction Market Overview
23.2. North America Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
23.3. North America Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
23.4. North America Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
24. USA Data Center Construction Market
24.1. USA Data Center Construction Market Overview
24.2. USA Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
24.3. USA Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
24.4. USA Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
25. Canada Data Center Construction Market
25.1. Canada Data Center Construction Market Overview
25.2. Canada Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
25.3. Canada Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
25.4. Canada Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
26. South America Data Center Construction Market
26.1. South America Data Center Construction Market Overview
26.2. South America Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
26.3. South America Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
26.4. South America Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
27. Brazil Data Center Construction Market
27.1. Brazil Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
27.2. Brazil Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
27.3. Brazil Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
28. Middle East Data Center Construction Market
28.1. Middle East Data Center Construction Market Overview
28.2. Middle East Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
28.3. Middle East Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
28.4. Middle East Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
29. Africa Data Center Construction Market
29.1. Africa Data Center Construction Market Overview
29.2. Africa Data Center Construction Market, Segmentation by Data Center Type, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
29.3. Africa Data Center Construction Market, Segmentation by Infrastructure, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
29.4. Africa Data Center Construction Market, Segmentation by End-Use, Historic and Forecast, 2018-2023, 2023-2028F, 2033F, $ Billion
30. Data Center Construction Market Competitive Landscape and Company Profiles
30.1. Data Center Construction Market Competitive Landscape
30.2. Data Center Construction Market Company Profiles
30.2.1. Google LLC
30.2.1.1. Overview
30.2.1.2. Products and Services
30.2.1.3. Strategy
30.2.1.4. Financial Performance
30.2.2. Amazon Web Services Inc
30.2.2.1. Overview
30.2.2.2. Products and Services
30.2.2.3. Strategy
30.2.2.4. Financial Performance
30.2.3. Microsoft Azure
30.2.3.1. Overview
30.2.3.2. Products and Services
30.2.3.3. Strategy
30.2.3.4. Financial Performance
30.2.4. The International Business Machines Corporation
30.2.4.1. Overview
30.2.4.2. Products and Services
30.2.4.3. Strategy
30.2.4.4. Financial Performance
30.2.5. Schneider Electric SE
30.2.5.1. Overview
30.2.5.2. Products and Services
30.2.5.3. Strategy
30.2.5.4. Financial Performance
31. Data Center Construction Market Other Major and Innovative Companies
31.1. Meta Platforms Inc.
31.2. NTT Ltd.
31.3. Turner Construction Co
31.4. STO Building Group Inc.
31.5. Equinix Inc.
31.6. DPR Construction Inc.
31.7. Iron Mountain Inc.
31.8. Digital Realty Trust Inc.
31.9. Stantec Inc.
31.10. SAS Institute Inc.
31.11. Zayo Group Holdings Inc.
31.12. Gensler
31.13. CyrusOne LLC
31.14. Hensel Phelps Construction Co.
31.15. Cyxtera Technologies LLC
32. Global Data Center Construction Market Competitive Benchmarking33. Global Data Center Construction Market Competitive Dashboard34. Key Mergers and Acquisitions in the Data Center Construction Market
35. Data Center Construction Market Future Outlook and Potential Analysis
35.1 Data Center Construction Market in 2028 - Countries Offering Most New Opportunities
35.2 Data Center Construction Market in 2028 - Segments Offering Most New Opportunities
35.3 Data Center Construction Market in 2028 - Growth Strategies
35.3.1 Market Trend-based Strategies
35.3.2 Competitor Strategies
36. Appendix
36.1. Abbreviations
36.2. Currencies
36.3. Historic and Forecast Inflation Rates
36.4. Research Inquiries
36.5. The Analyst
36.6. Copyright and Disclaimer

Executive Summary

This report provides strategists, marketers and senior management with the critical information they need to assess the market.

This report focuses on data center construction market which is experiencing strong growth. The report gives a guide to the trends which will be shaping the market over the next ten years and beyond.

Reasons to Purchase

  • Gain a truly global perspective with the most comprehensive report available on this market covering 50+ geographies.
  • Understand how the market has been affected by the COVID-19 and how it is responding as the impact of the virus abates.
  • Assess the Russia - Ukraine war’s impact on agriculture, energy and mineral commodity supply and its direct and indirect impact on the market.
  • Measure the impact of high global inflation on market growth.
  • Create regional and country strategies on the basis of local data and analysis.
  • Identify growth segments for investment.
  • Outperform competitors using forecast data and the drivers and trends shaping the market.
  • Understand customers based on the latest market shares
  • Benchmark performance against key competitors.
  • Suitable for supporting your internal and external presentations with reliable high quality data and analysis
  • Report will be updated with the latest data and delivered to you along with an Excel data sheet for easy data extraction and analysis.
  • All data from the report will also be delivered in an excel dashboard format.

Description

Where is the largest and fastest growing market for data center construction? How does the market relate to the overall economy, demography and other similar markets? What forces will shape the market going forward? This report answers all these questions and many more.

The report covers market characteristics, size and growth, segmentation, regional and country breakdowns, competitive landscape, market shares, trends and strategies for this market. It traces the market’s historic and forecast market growth by geography.

Report Scope

Markets Covered:

1) By Data Center Type: Small-Scale Data Centers; Medium-Scale Data Centers; Large-Scale Data Centers
2) By Infrastructure: Electrical Infrastructure; Networking Infrastructure; Other Infrastructures
3) By Power Distribution and Cooling Infrastructure: Power Distribution; Cooling
4) By End-Use: Banking, Financial Services and Insurance (BFSI); Energy; Government; Healthcare; Manufacturing; IT and Telecom; Others End-Uses

Key Companies Mentioned: Google LLC; Amazon Web Services Inc; Microsoft Azure; The International Business Machines Corporation; Schneider Electric SE

Countries: Australia; Brazil; China; France; Germany; India; Indonesia; Japan; Russia; South Korea; UK; USA; Canada; Italy; Spain

Regions: Asia-Pacific; Western Europe; Eastern Europe; North America; South America; Middle East; Africa

Time Series: Five years historic and ten years forecast

Data: Ratios of market size and growth to related markets, GDP proportions, expenditure per capita

Data Segmentation: Country and regional historic and forecast data, market share of competitors, market segments

Sourcing and Referencing: Data and analysis throughout the report is sourced using end notes

Delivery Format: PDF, Word and Excel Data Dashboard